Home Page Contact Us Site Map
فارسی | Search

News Details

Installation and commissioning of 7500 Nm3/h Air separation Unit at Bardsir Steel Making Plant

Aryana Petro Tavan was awarded a contract for Installation and Commissioning of 7500 Nm3/h Air Separation unit at Bardsir Steel making  plant  near city of Kerman. The client for this project is TAM Iran khodro.

The plant is designed to produce 7500 Nm3/h  Gaseous Oxygen, 2000 Nm3/h Gaseous  Nitrogen and  80 Nm3/h Liquid Argon. APT who is an exclusive agent of Fortune gas in Iran was responsible for providing  ASU plant.

Bardsir Steel  making plant is located near city of kerman with area over 150 hectare  with annual  Production capacity of One million tone steel.

 

 

 

  • contact information:
  •  
  • Tel: +98 (21) 26406242
  • P.O.Box: 1516734456
  •  
  •  
  • Fax: +98 (21) 26406243
  • info@apt-engineering.com
Copyright © 2011 Aryana Petro Tavan Co.  All rights reserved.  |  Designed & Powered by ZAMAN